工程
Your current location: Home >> Case >> Customer feedback >>

Customer feedback

Customer feedback


Customer recognitionIt is the driving force for our continuous progress and development



1571274514920400.png

♦  Mr. Wang and his delegation from Beihai Huihong new materials Co., Ltd. came to the headquarters of the group company to present the golden banner and medal, and thanked Beihai Project Department of our company for its outstanding contribution to the project construction. Wang Zhongtu, Zhang Pijun, deputy general manager of the group company, and Xu Wei, project manager attended. Binzhou Beihai Huihong new materials Co., Ltd. Beihai branch B and C series flue gas desulfurization system EPC project, which is constructed by Beihai Project Department of the third branch of the group company's project management head office, under the leadership of the group company and manager Xu Wei, has overcome difficulties and challenges, and successfully completed this project after overcoming the constraints of strong magnetic field, limited site and tight construction period The project was started and operated well on June 29, 2019. It was completed ahead of schedule as agreed in the contract, making "impossible to be possible", which was highly praised by the owner and leaders of the group company. In the future, the two companies will take this opportunity to deepen cooperation, share resources, enhance friendship and lay a solid foundation for further cooperation.



1571274579872395.png♦  Zhang Shuting, deputy general manager of the production department of Huaneng Wuhai thermal power plant, and Gao Zhongyi, minister, visited the headquarters of the group company to present our company with the banner of "being able to fight hard and having a good style", and fully affirmed the completion of the desulfurization and collaborative dust removal part of the ultra-low emission reconstruction project of the 2x200mw unit of Wuhai thermal power plant with quality and quantity guaranteed.

   Mr. Zhang Shuting sincerely thanked the project team of Guoshun group for attaching great importance to Wuhai project in terms of project organization and management, construction team and technology. In the face of such adverse factors as narrow space, tight construction period and great difficulty in construction, the construction team of Guoshun group has always adhered to the concept of "one person" cooperation, played the spirit of tackling difficulties without fear of difficulties, and strictly followed the outsourcing of Wuhai thermal power plant Project safety management standard is used for project management and control. Detailed safety side-by-side, technical scheme, quality inspection and other measures are formulated. Safety and environmental protection are implemented layer by layer and quality is closely linked. All efforts are made to do a good job in all works, which provides a strong guarantee for the safety, quality and smooth operation of the project. The heating node plan of Wuhai thermal power plant is realized on schedule, winning the owner's production departments and Highly praised by the leader.

Huaneng Wuhai power plant's affirmation of our company's construction management is also a spur to our company's future project construction management. The group company will continue to implement its commitment, adhere to the engineering concept of "building a set of environmental protection equipment, eliminating a source of pollution". After all projects are completed, they will all be put into operation once and reach the standard and operate stably for a long time, striving to build more benchmark projects.


1571274648789716.png

♦  Li Fengming, deputy general manager of Linyi Jiangxin iron and Steel Co., Ltd. and Yang Chuanyang, factory director, came to the headquarters of the group company and presented the banner with the words "make every effort to make high-quality products and catch up with the time" to thank Guoshun group for completing the construction in advance in the project of "2 * 210 ㎡ sintering desulfurization flue gas wet electric precipitator project of Linyi Jiangxin iron and Steel Co., Ltd.". Lu Shengtao, vice president of engineering of the group company, accepted Jinqi on behalf of the company. Zhang Pijun, vice president of operation, Bi genyao, minister, Li Fei, Minister of administration, human resources department and material supply department, and Mai Xiaokui, Minister of engineering management department participated in the reception. In the reception, general manager Li and director Yang of Jiangxin iron and steel highly praised Guoshun construction team, who is still dedicated and efficient in the construction process of this project under the condition of tight time and heavy task, and ensured the early completion and operation of "2 * 210 ㎡ sintering desulfurization flue gas wet electric precipitator project". Leaders of the group company said that the chairman of the board of directors attached great importance to the project, and arranged a special person to follow up the design, construction and material supply, on the premise of ensuring quality and safety, shorten the construction period and complete the project construction in advance Guoshun group's ultra-low emission performance can not be achieved without the full affirmation and trust of the owners. The group company will, as always, strictly follow the requirements of the contract, check at all levels, ensure the quality of service, provide more high-quality and efficient services for the owners, and open up innovative territory and glory in the course of air pollution prevention and control!

  

Tag

Product

News

                               Copyright: Shandong Guoshun Construction Group Co., Ltd. Tel: 0531-87215932 address: No.001, Guoshun Road, Jinan Economic Development Zone, Changqing District, Jinan Cit    No. 11017647-1 of luicp